Waltham Process
Back ] Next ]

Home
Routine 1
Routine 2
Routine 3
Routine 4
Routine 5
Routine 6
Routine 7

This set of blue prints show a booklet that was used to inform workers of the standard production process for watches at Waltham around 1914. (Routine Sheet 1 is dated 1/8/14.)

The links at the left can be followed sequentially to read the work flow. The links directly below give the general setup and daily routine for each desk in the Inspection Room.


Inspection Desk A Desk B Desk C1 Desk C2

Routine1.jpg (408516 bytes) Routine2.jpg (424177 bytes) Routine3.jpg (430873 bytes) Routine4.jpg (391582 bytes) Routine5.jpg (389968 bytes) Routine6.jpg (418663 bytes) Routine7.jpg (401919 bytes)
 Inspection.jpg (375851 bytes)
 DeskA.jpg (341156 bytes) DeskB.jpg (342492 bytes) DeskC1.jpg (349283 bytes) DeskC2.jpg (321947 bytes)


Tommy the JOAT HomeSend me mail
© 2005 Thomas W. McIntyre, all rights reserved

Home ] Back ] Next ]                               
Collections
Serial Numbers